Since the development of the power industry, transmission, transformation, and external insulation of distribution have always been a major problem that plagues the power industry, causing accidents and operation and maintenance losses to the global power grid to exceed 300 billion yuan each year. SMAREPC has completely solved this problem with invented products and solutions, and these are the results of years of continuous innovation
Good news
▶In December 2020, SMAREPC won the bid for the 220kV composite cross arm procurement project of Jiangsu Electric Power Company Jiatong Energy
▶In December 2020, the SMAREPC won the bid for the Indian State Grid 765kV transmission project
▶On January 11, 2021, SMAREPC won the bid of 110.8 billion yuan for Jiangsu Jiatong Energy 220kV composite cross arm transmission project (EPC)
Century problem
Pollution flashover, rain flashover, icing flashover, guano flashover, wind swinging, large corridor area
New technology
Composite cross arm overall solution for transmission project——30 years of maintenance-free
Standards lead
Leading the formulation of the IEEE international standard "Technical Guidelines for Composite Cross Arm Tower Overhead Transmission Lines"
Industry changes
From 2009 to 2019, our products were used in engineering demonstration applications with a full range of voltage levels (110kV-1000kV) worldwide; in 2020, large-scale applications begin globally, starting the way from quantitative change to qualitative change.