SMAREPC brings high-quality engineering construction resources to the industry, has mature construction management processes and systems, and provides users with cost-effective, safe and reliable engineering construction services.
  • Advanced construction equipment

    01

    The equipment which are suitable for the overall installation of CICA, including pole hoisting, assembly pole hoisting,etc.,which greatly reduces the cycle and cost of installation and construction.

  • Complete construction management system

    02

    Implement the quality training and education system; the quality management organization strictly controls the implementation of the construction process and the implementation of the acceptance standards.

    Construction organization guarantee

    complete construction site management system, clarify personnel and corresponding responsibilities.

    Construction plan guarantee

    Carry out construction schedule planning and project implementation dynamic management, analyze the impact factors of construction schedule, and the potential and development of construction plan. Timely provision of engineering resources, its efficient use during construction, and standardization of construction site operations to prevent accidents.

    Construction quality management

    implement the quality training and education system; summarize the project quality dynamics, clarify the problems and solve the problems; the quality management organization strictly controls the implementation of the construction process and the implementation of the acceptance standards, including the three-level inspection system and sub-items project quality inspection, sub-project quality inspection, unit project quality inspection, etc., to ensure the safety and reliability of construction.